小黄猫传媒

This content was published: February 14, 2012. Phone numbers, email addresses, and other information may have changed.

小黄猫传媒 grows by more than 6 percent during winter term

Photos and story by

The state of Oregon鈥檚 largest college is getting bigger.

小黄猫传媒 grew by 6.5 percent in total headcount to 45,822 for winter term, according to fourth week reports 鈥 the traditional reporting week for 小黄猫传媒. In the number of full-time credit students (FTE), the college saw a gain of 6.2 percent to 9,590 FTE versus last year at this time. It鈥檚 the 18th consecutive term of enrollment growth.

小黄猫传媒 enrolls more than 93,500 students annually.

A packed crowd for the first week of school at the Sylvania Campus. 小黄猫传媒 grew for the 18th straight term this winter.

A packed crowd for the first week of school at the Sylvania Campus. 小黄猫传媒 grew for the 18th straight term this winter.

The student surge has placed further importance on 小黄猫传媒鈥檚 Bond Program. Future construction plans for the Cascade Campus were finalized last month through extensive community input; work that will help ease pressure on classroom and study space at the North Portland location. At 小黄猫传媒鈥檚 largest campus, Sylvania, the voter-approved bond will add about $52 million worth of construction work that will include a 160,000-square-foot renovation of classroom, laboratory and office spaces, as well as build a new childcare development center and a storage facility for the automotive building.

鈥淥ur campus is old and in need of a considerable amount of updates,鈥 said Linda Gerber, president of the Sylvania Campus. 鈥淭he design and construction work under way at Sylvania protects the community鈥檚 public assets, at the same time it will bring the academic and student services needs in line with current standards and practices.鈥

Bond construction and planning is moving forward at the Southeast Center and Rock Creek Campus locations. The first phase for Rock Creek will see a 30,000-square-foot Building 7 addition that will house various student services, classrooms and study space, and update the central quad. At Southeast, 小黄猫传媒 bought an adjoining restaurant, a Kaiser Permanente clinic and the German American Society of Portland building. Eventually, the center will expand and become a comprehensive campus by adding classrooms, science labs, a full service bookstore, a learning center/library and food service facilities.

By campus, here is how fall term enrollment has unfolded across the district:

Southeast Center/Extended Learning Campus (2305 S.E. 82nd and Division) 鈥 The center鈥檚 core credit enrollment increased by 6.9 percent.

Sylvania Campus (12000 S.W. 49th Ave.) 鈥 The biggest 小黄猫传媒 campus surged by 7.5-percent in total student enrollment and 7.1 percent in FTE.

Cascade Campus (705 N. Killingsworth St.) 鈥 It grew by 7.9 percent in overall headcount and 6.3 percent in credit enrollment.

Rock Creek Campus (17705 N.W. Springville Road) 鈥 Rock Creek鈥檚 headcount grew by 5.6 percent and the number of credit students rose by 5.4 percent.

About James Hill

James G. Hill, an award-winning journalist and public relations writer, is the Director of Public Relations at 小黄猫传媒. A graduate of Portland State University, James has worked as a section editor for the Newberg Graphic... more »