小黄猫传媒

This content was published: March 14, 2016. Phone numbers, email addresses, and other information may have changed.

Cascade’s remodeled Student Services Building gains new entry for a new era

Photos and story by

Bond-funded improvements at Cascade's Student Services Building included creating a new entry that matches the existing building's fa莽ade.

With two new buildings, an underground parking garage and new plaza, it鈥檚 easy to see the impact of the 2008-voter approved bond measure at 小黄猫传媒鈥檚 Cascade Campus.聽But there also has been extensive work inside existing buildings that promises to have an appreciable effect on students, faculty and staff.

The Student Services Building (SSB) was built in 1996 and was showing its age in terms of tired paint, worn carpet and old furniture. Beyond that, however, the design of the building was not serving the present needs of the campus.

Laura Klinger, senior associate with 聽described a litany of challenges at SSB:

  • 鈥淭he ground floor central space felt confined and access to various student services was confusing.
  • 鈥淎ccess to the building was disorienting and uninviting. The main south facing front doors had been sealed closed in an effort to control the outside air temperatures from affecting the seating areas directly adjacent to the doors.聽The main access from the plaza was聽through a small door into a stairwell and then into the main space of the building.
  • 鈥淭he business services area was divided up into several different spaces that limited work area and access to natural light.
  • 鈥淭he testing center on the second floor lacked individual testing rooms for students with special needs.鈥
The Answer Center in the main lobby allows convenient access to vital student services.

The Answer Center in the main lobby allows convenient access to vital student services.

Michael Strachan, project manager for 聽a minority-owned general contractor working at Cascade, said several technical issues also needed to be addressed. These included increasing the building鈥檚 tele/data capacity, digitizing existing analog CCTV security systems, and adding a new generator to update the emergency power and egress lighting systems.

鈥淭he construction work at SSB is similar to what you鈥檙e seeing occurring across campus: multiple renovations all aimed at updating the campus infrastructure, lowering long-term operational costs, and enhancing public use by creating more usable spaces,鈥 said Strachan.

Thanks to funds from the bond measure, the college set out to renovate all three floors of SSB for better flow and efficiency.

In the lobby on the first floor, a major project was to create an Answer Center, where students access vital services 鈥 Financial Aid, Student Accounts and Enrollment 鈥 in one convenient location. This one-stop-shopping concept has already been introduced at Sylvania and Southeast campuses.

Before the bond improvements, this central area suffered from ceilings that were at multiple heights, and several different kinds of flooring.

鈥淲e simplified the ceiling layout and added new acoustical tile areas to help control sound. We also covered the entire floor with a light gray聽ceramic聽tile to unify the space,鈥 said Klinger.

First floor work also included updating office space for Counseling, Advising and Career Services, plus pushing out an exterior wall to gain natural light for much needed lounge seating.

鈥淥n the second floor we replaced the last classroom in the building with the Orientation Center,鈥 said Cascade鈥檚 bond project manager, Rebecca Ocken. 鈥淭his move allowed the Testing Center to expand with three new distraction-free testing rooms.鈥

The Testing Center on the second floor was expanded to add individual rooms for students with special needs.

The Testing Center on the second floor was expanded to add individual rooms for students with special needs.

More work on the second floor included a new large telecom room to serve all the technology needs for the first and second floors, and a larger location for Community Education.

On the third floor, new offices for the math faculty were created in the space that was freed up when 小黄猫传媒鈥檚 Human Resources staff moved to Downtown Center in 2011.

The last improvement to be completed at SSB was a new vestibule, which gives a clear path of arrival through the original entry doors facing the plaza on the building鈥檚 south side, and direct access to the Answer Center. The vestibule also brings in natural light and provides an intermediate space that addresses the temperature control problems that originally plagued the area near the main doors.

Aesthetics were also a consideration.

鈥淏y matching the existing building鈥檚 window system and exterior color palette, the new vestibule fits seamlessly into the building fa莽ade and provides a clear, welcoming point of entry. We are very pleased with the results,鈥 said Klinger.

Strachan of Pacificmark shared his own views on the completed project.

鈥淭he results of the renovation are subtle but functional, and should serve 小黄猫传媒鈥檚 needs at the SSB long into the future,鈥 he said. 鈥淯ltimately, the most pleasing result in my mind, is seeing members of the local community comfortably utilizing the finished space as it鈥檚 intended.鈥