Facilities Plan Phase 2
In this second and final phase of the Facilities Plan, we drew from the wealth of data collected in Phase 1 to envision our future college development.聽Little did we know when we started this work in 2020 that it would all need to be done virtually.聽With a focus on outreach and engagement through online surveys, focus groups, and remote workshops, along with an inquiry plan using a Critical Race Spatial Lens, we know what an important resource the college is to students.聽This qualitative input enriched our campus development plans and added a level of confidence to our future projections.
Facilities Plan report
Technical reports
- Appendix materials
- Appendix A 鈥� Outreach and Engagement Summaries
- Appendix B 鈥� Building Functional Assessments
- Appendix C 鈥� Alternative Land Use Study
- Appendix D 鈥� Demographic Analysis Memo
- Appendix E 鈥� Enrollment Study
- Appendix F 鈥� Space Needs Report
- Appendix G 鈥� Transportation Memos
- Appendix H 鈥� Land Use Memo
- Appendix J 鈥� Critical Race Spatial Lens Report
- Appendix K 鈥� Developable Land Analysis
- Appendix L 鈥� Career Technical Education Study